| |
Master Plan Floor Plan Location |
|
The Project
- Spread over 30 acres of land.
- Overall development of 1.1 million sft of IT space and 0.4 million sft of residential space in a phased manner.
- Comprehensive common infrastructure including roads, underground HT power distribution, water suppy, sewerage and storm water networks, communication network, etc.
- Continuous scalability over the next 5 years.
- Provision of food court, ATMs, fitness centre, etc.
- High end Security Systems.
- Pleasant water bodies and landscaping.
- Mixed development of multi-tenanted and built to suit facilities.
- Integrated township with walk to work concept
- Efficient floor plates (about 84% for single occupancy).
Amenities
- Large floor plates with low column density and high ceiling.
- Centralized air-conditioning system with bifurcation into human and machine comfort.
- Comprehensive fire protection system including hydrant, automatic water sprinkler and fire detection & alarm systems.
- Highly reliable electrical distribution system with ample redundancies.
- 100% Diesel Power Generator back-up.
|
|